Product Details

CFS01 Mortar

  • Model:CFS01 Mortar

    Product Introduction

    Description:
    CFS01 Mortar is a proprietary non-intumescent compound comprised of gypsum and cement.
    Developed with installation convenience in mind,INCA Mortar softens once mixed with water and
    becomes easy to work with. Our variable viscosity technology allows the installer to add less water
    for a thicker consistency or more water for a thinner consistency depending on your
    application needs. INCA Mortar has up to 3 hours fire rating to prevent passage of flame,
    smoke, and toxic fumes.

    Feature:

    ●Non-Shrinking
    ●Paintable
    ●Fast drying
    ●Safe and simple to use
    ●Halogen and asbestos free
    ●Water and gas impermeable
    ●Good structure strength
    ●Adjustable consistency (variable mix ratio)
    Specification:

    Mixing ratio(by weight)Mortar:water=1:0.85~.95  (Recommended)
    Yield(per 20Kg)22-25L
    Mixing time 30~40Sec.
    Working time3min.
    Density (after mixing)  1400-1650kg/m³(Wet cast)
    Sethard timeApprox.3~4hours.
    Time to remove shuttering (if needed)    2days
    Fully cured    28days
    ApplicationSealing floor openings
    Package   20Kgs/Bag

    Test:
    ●UL1479,3hrs T and L Rating
    ●Can/ULC S115 3hrs,FTH Rating
    ●GB23864

    Installation guide:

    1. Clean surfaces of the opening and all penetration items to avoid any grease and dust.

    2. An appropriate backer must be installed first, cut to fit below the opening to
        
    support the mix until it cures. Combustible backers must be removed once material had cured.
        Noncombustible backers may remain in place.

    3. Mix with clean water in a proper container.
       
     According to the mixing ratio
       ( Mortar : Water = 1:0.85~0.95 ), slowly add the mortar into water while
       stirring by power mixer to ensure a smooth lump-free mix
       (Note: Do not
    add water into mortar).
       Mix well for 30-40 sec.  and the wet mixture is better pour
       into the floor opening within 3 minutes after mixing.

    4. Pouring the wet mix into the opening to allow for the proper
       depth of fill materials. If the first pouring depth is not sufficient, add more wet mix
       after the mortar is set.

    5. Remove the shuttering plate after the mix has set if it is combustible.